Grid-tied solar system with net metering
On-grid system to lower your bill and export the surplus
Grid-tied solar system with an on-grid inverter to lower your bill and export the surplus through net metering. We guide you through the paperwork.
Get a quote on WhatsAppNo published prices: every project is different. Message us on WhatsApp with what you need and we will send you a quote.
Ideal for
- Homes with high daytime consumption
- Businesses with daytime hours
- Offices
- Homes with few power outages
Description
A grid-tied system uses solar panels to cover part of a home's or business's consumption during the day. When the panels produce more than is being used, the surplus goes out to the grid of the power distribution company (Edesur, Edenorte or Edeeste, depending on your area). Under the net metering program, that exported energy is recorded on a bidirectional meter and taken into account on your bill, according to the rules in effect.
It's the most direct way to lower your bill, because it doesn't need batteries. But there's one important point: for safety, a grid-tied inverter shuts off when the power goes out, so it doesn't send current into lines where the utility's crews may be working. If you need backup during outages, you have to add batteries with a hybrid inverter.
Interconnection requires an application to the distribution company that serves you, which usually asks for technical documents and an inspection before installing the meter. We guide you through the process and prepare the technical side, but the conditions, timelines and how credits are applied are set by the distribution company; check the current terms with them. Law 57-07 on renewable energy incentives sets the general framework; the details change, so we review them with you case by case.
Features
- On-grid inverter connected to the distribution company's grid
- No batteries, focused on lowering your bill
- Surplus exported through a bidirectional meter
- Shuts off during power outages for safety
- Can be upgraded to hybrid with batteries
- Production monitoring on your phone
The service includes
- Bill analysis
- System design
- Technical documents for the application
- Installation and commissioning
Frequently asked questions
With net metering, will I have power during outages?
No. For safety, a grid-tied inverter shuts off when the power goes out. For backup, you need to add batteries and a hybrid inverter.
How long does the distribution company take to approve it?
It depends on the distribution company and its workload. We guide you through the steps, but they set the timeline.
Photo credits
- 1: DezzignProtect, CC BY-SA 4.0, via Wikimedia Commons
- 2: DezzignProtect, CC BY-SA 4.0, via Wikimedia Commons
Reference photos of the product type; the model we install may vary with your project.